Q6.
You are implementing Microsoft Test Manager.
You need to use Lab Center to create the lab environments for an upcoming project.
For each requirement which type of lab environment should you create? To answer drag the appropriate lab environment to the correct requirement. Each Lab environment may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
Lab environments
Network isolated
System Center Virtual Machine Manager (SCVMM)
Standard lab
Answer Area
Requirement |
Lab environment |
Create several environments from the same template and perform test on them at the same time, without network name clashes. |
Lab environment |
Save an environment as a template from which you can create new environments with new virtual machines. |
Lab environment |
Add any physical or virtual Windows machine to the environment. |
Lab environment |
정답 : Network Isolated, System Center Virtual Machine Manager (SCVMM), Standard lab
해설 : 해당되는 답을 선택해서 드래그하는 문제입니다. 오른쪽 부분이 답을 적어야 하는 표입니다.
Lab Environment를 사용하여 테스트 환경을 구축하는 문제입니다. 다음의 링크를 참조하십시요.
https://msdn.microsoft.com/en-us/library/ee830479.aspx
Standard lab에 관해서는 https://msdn.microsoft.com/en-us/library/ee390842.aspx를 참조하십시오.
Q7.
You are using Microsoft Test Manager (MTM) to manage test cases.
You want to review all test cases with shared steps.
You need to build a direct links query that will generate a list of all test cases in the team project that use a shared step.
Which three actions should you perform? Each correct answer presents part of the solution.
- Return all top-level work items.
- Set the linked work items filter to Work item type = Shared Steps.
- Return only items that do not have the specified links.
- Set the main query to Team Project = @Project AND Work Item Type = Test Case.
- Return only items that have the specified links.
정답 : B, D, E
해설 : 평이한 문제입니다.
아래의 "Share steps between test cases" 관련 문서를 참조하십시오.
https://docs.microsoft.com/en-us/azure/devops/test/mtm/share-steps-between-test-cases?view=vsts
Q8.
You are using Microsoft Test Manager (MTM). You are using Microsoft Solution Framework (MSF) for Agile Software Development process template.
SharePoint integration and reporting are enabled.
You want to access your team’s testing effort.
To do this, you need to
- identify how much testing has the team completed.
- determine whether the team is likely to finish the testing on time.
- identify how many tests have passed, failed or blocked and
- identify how many tests are left to be run.
What should you do?
- From the team portal, open the Test Activity Excel Report.
- Open the Test Results view in MTM.
- From the team portal, open the Test Case Readiness Excel Report.
- From the team portal, open the Test Plan Progress Report.
정답 : D
해설 : C와 D가 혼란스런 문제입니다.
아래의 "Test Plan Progress Report"관련 설명을 참조하십시오.
테스트 관련 "Guidance on Microsoft Test Manager usage" 문서는 다음과 같습니다.
https://docs.microsoft.com/en-us/azure/devops/test/mtm/guidance-mtm-usage?view=vsts
Q9.
You are using Microsoft Test Manager (MTM) for manual test runs.
You are creating an action recording but some of the recorded actions were not part of the intended steps.
You need to remove only the unwanted actions from the current action recording.
What should you do?
- Reset the test case inside the test runner and create a new action log.
- Open the test results and edit the action log to remove the unwanted actions.
- Open the test results and save the action log. Edit the action log to remove the unwanted actions, import the file as an attachment, overwriting the initial action log.
- Delete the unwanted actions from the captured actions inside the test runner.
정답 : D
해설 : "Share step"에 관련된 문제입니다. 실제로 해보시면 확실하게 알수 있습니다.
해당 문서는 다음과 같습니다.
Q10.
You are using Microsoft Test Manager to view user stories and tasks in new team project.
You are building a new query that must return both work item types in a single result set.
The default clause Team Project = @Project is already specified. You need to complete the query.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange in the correct order.
Actions
- Add the clause Or Work Item Type = Task.
- Group the added clauses and the default Team Project clause.
- Add the clause And State = User Story.
- Add the clause And Work Item Category = Task.
- Ungroup the added clauses.
- Add the clause And Work Item Type = User Story.
- Group the added clauses.
정답 : 1, 6, 7
해설 : Query에 관한 문제입니다. 여러가지 Query를 동시에 하여 결과를 얻습니다.
다음 링크를 참조하십시오.